2018/11/27

Priority 1 Maintenance

While I don't have jurisdiction over much of this, the Road Fork Section, Points 27 (7/2011 map & guide) to 31, perhaps out to Whipple 03 should have the 1st trail maintenance.  And this should take place before June 30th annually.  The reason is that we have an economic cooridor between these points.  I say perhaps Whipple 03 because Points 01 - 03 are not a very popular destination.  And that segment has an adopter who usually comes in July.  I supervise that section, but that segment is something that I shouldn't touch.  Probably the most that I can do is hike through and collect waypoints on downed trees so that my NFS point of contact can cut them?

From the time of the ground thawing to May 31 is the most ideal time for benching.  This is the physical widing of the trail's tread with a mattock axe.  It's typically done on a hillside.  I must say that I have no idea what condition my lower back will be in by that time?

At the moment, I have to get in control of my own finances. I'm projecting that January 1st will the be the first time my budget can properly reset and get straightened out? At the previous board meeting, we're not getting any back up.  But I didn't request any.  The BTA has enough on it's plate and I've decided that we're going to go it alone. And it's becoming imperative that we start becoming more independent locally.

This is where January comes into play.  I'm going to use it for trail promotion, but I'm not ready to publically state where, when or how?

2018/11/08

Benching

The best trail maintenance to get done from around 3/1 to 6/1 in Far SE Ohio is benching. This is when one uses a mattock axe to widen the trails surface horizontally along the roll of a hillside.  In the Marietta Unit of The Wayne, the Buckeye/ North Country Trail has about 36 miles of nearly continuous off-road trail in the Appalachian Foothills of Ohio. And there's a lot of benching to be done back there.

With a lack of expertise, that had to be learned this year.  And I'm not even on planning for the winter just yet. There is a few personal tasks things to get done around here first.

2018/08/05

Reorganizing GPS Data, Trail Conditions, DR Mower

It just took hours to re-organize my GPS data.  The directory for Adventurer's Project is getting bigger.  I just mapped out the known bad roads that could access the Buckeye Trail (North Country concurrent) in the Marietta Unit of The Wayne (National Forest).  I know where some of the fords are and I know what roads not to take with an RV.

At present, there are still 13 known obstructions, or trees down on the trail.  There are at least 8 areas that still need weed whacking, but most of them are brief.  They look like they were places in the middle of a segment where residential weed whackers gave out and quit for the day.  Some of it looks like somebody might have just ran them right over the centerline of the trail without swinging to get the 4ft width. 

Benching is another story.  The work crews tell me that it's probably not worth getting a DR Mower for this area.  But in working with Road Fork Section's (volunteer) supervisor, I weed whacked everything he said the DR couldn't access and in my opinion, a lot of those areas just need short stretches to be benched wider (leveling the roll of a hill side).